Yenikoy Kemerkoy Power Plant Boiler Rehabilitation Project
In the rehabilitation works undertaken by General Electric at the power plant owned by IC İçtaş – Limak consortium, which has a capacity of 3×210 MW, activities included the rehabilitation of the FGD (Flue Gas Desulfurization) system, the renewal of compensators, and the rectification of various mechanical works in the rest of the field.
Project and Details
Employer: IC İçtaş ve Limak
Installed Capacity: 630 MW
Location: Mugla
Scope: Rehabilitation Works
Commencement Date: 2021
Date of Delivery: 2021