Atlas Energy 2×600 MW Thermal Power Plant Mechanical Maintenance Project

The construction management of the 2×600 MW thermal power plant project owned by Atlas Energy has been conducted.

Project and Details

Employer: Atlas Energy

Installed Capacity: 2×600 MW

Location: Iskenderun

Scope: Planned Maintenance

Commencement Date: 2021 / 2022 / 2023

Date of Delivery: 2021 / 2022 / 2023

Hitachi Zosen Inova & Makyol 3000 Tons/Day Waste to Energy

The project, conducted in collaboration between Hitachi Zosen Inova and Makyol, focuses on converting 3000 tons of waste into energy daily. Our project aims to support environmental sustainability in waste management and energy production.

Project and Details

Employer: Hitachi Zosen Inova and Makyol

Installed Capacity: 78 MW

Location: Istanbul

Scope: : Electrical and Mechanical Works

Commencement Date: 2020

Date of Delivery: 2023

Iskenderun Iron and Steel Factory Tank-Pipe Production and Installation Project

The replacement and commissioning of the coke gas pipelines at the Iskenderun Iron and Steel plant constitute the scope of the project undertaken by us.

Project and Details

Employer: ISDEMIR

Location: Iskenderun

Scope:Piping Installation Works

Commencement Date: 2022

Date of Delivery: 2023

Ak Energy TechNity Konya Biomass Energy Plant – Turbine and ACC Installation Project

Services have been provided for the turbine-generator assembly, ACC (Air Cooled Condenser) assembly, and pipe installation, as well as the commissioning processes of the BIOMASS power plant owned by AK Energy.

Project and Details

Employer: Ak Energy

Installed Capacity: 10 MW

Location: Konya

Scope: Turbine assembly, ACC assembly, and pipe installation.

Commencement Date: 2023

Date of Delivery: 2023

Veolia Istanbul Waste to Energy O&M Supports

Veolia Istanbul provided support in waste-to-energy operations through our collaboration.

Project and Details

İşveren: VEOLIA Turkey

Location: Kemerburgaz/ ISTANBUL

Scope: Operation and Maintenance Supports for Mechanical and
Electrical Works

Commencement Date: 2022

Date of Delivery: 2023

Yeniköy Kemerköy Power Plant Boiler Rehabilitation Project

In the rehabilitation works undertaken by General Electric at the power plant owned by IC İçtaş – Limak consortium, which has a capacity of 3×210 MW, activities included the rehabilitation of the FGD (Flue Gas Desulfurization) system, the renewal of compensators, and the rectification of various mechanical works in the rest of the field.

Project and Details

Employer: IC İçtaş ve Limak

Installed Capacity: 630 MW

Location: Muğla

Scope:Rehabilitation Works

Commencement Date: 2021

Date of Delivery: 2021

SASA Polyester Factory New PTA Facility Tank Installation Works

SASA Polyester Factory’s New PTA Facilities – Installation of carbon steel tanks in accordance with API 650 standard.

Project and Details

Employer: SASA Polyester Sanayi A.Ş.

Location: Adana

Scope: SASA Tank Installation

Commencement Date: 2022

Date of Delivery: 2023

SASA Polyester Factory New PTA Facility Piping and Mechanical Installation Works

At the SASA Polyester New PTA Facility, installation, testing, and reinstatement of carbon steel and stainless steel piping are carried out

Project and Details

Employer: SASA Polyester Sanayi A.Ş.

Location: Adana

Scope: Piping and Mechanical Works

Commencement Date: 2023

Date of Delivery: 2023

SASA Polyester Factory New PTA Facility Electrical – I&C (Instrumentation and Control) Installation and Testing Activities

At the SASA Polyester New PTA Facility, activities include electrical panel installation, cable pulling, cable termination, panel mounting, instrument installations, and related electrical testing.

Project and Details

Employer: SASA Polyester Sanayi A.Ş.

Location: Adana

Scope: Electrical – I&C Installation and Testing Activities

Commencement Date: 2023

Date of Delivery: 2023

Samsung C&T Kırıkkale 935 MW CCPP ACWA Power

We successfully managed the construction and commissioning processes as the EPC contractor for ACWA Power’s 935 MW CCPP project in Kırıkkale.

Project and Details

İşveren: ACWA Power

Installed Capacity: 935 MW

Location: Kırıkkale

Scope: Managment of the Construction and Commissioning as EPC Contractor

Commencement Date: 2014

Date of Delivery: 2017

Bahrain 1800 MW Combined Cycle Power Plant (CCGT) Assembly Project

The construction management of the EPC (Engineering, Procurement, and Construction) phase of the 1800 MW capacity power plant, which houses the largest H-Class turbines in the Middle East, has been undertaken by our team.

Project and Details

İşveren: Alba Aluminium

Installed Capacity:1800 MW

Location: Bahrain

Scope: Construction Works

Commencement Date: 2016

Date of Delivery: 2020

Istanbul Metropolitan Municipality Waste Incineration and Energy Generation Facility Commissioning and Maintenance Project

We participated in the management of the construction phase’s EPC (Engineering, Procurement, and Construction) process of the Istanbul Metropolitan Municipality’s plant, in collaboration with the consortium of Hitachi Zosen Inova and Makyol A.Ş.

Project and Details

Employer: Hitachi Zosen Inova and Makyol

Installed Capacity: 78 MW

Location: Istanbul

Scope: Commissioning and Maintenance Works

Commencement Date: 2019

Date of Delivery: 2021

Hitachi Zosen Inova: The World’s Largest Waste-to-Energy Project in Dubai – 5500 Tons

As the EPC (Engineering, Procurement, and Construction) contractor, we played an active role in the completion of Dubai’s largest waste-to-energy project, processing 5,500 tons of waste per day to generate energy.

Project and Details

Employer: Hitachi Zosen Inova

Location: Dubai

Scope: Managment of the Construction and Commissioning as EPC Contractor

Commencement Date: 2020

Date of Delivery: 2023