Atlas Energy 2×600 MW Thermal Power Plant Mechanical Maintenance Project
During the maintenance activities planned for the years 2021-2022 and 2022-2023, boiler tube replacements, pressure valve replacements, maintenance of the seawater intake pump, pulverized coal line replacements, maintenance and replacement of air dampers, APH (Air Preheater) maintenance, and various other tasks were completed.
Project and Details
Employer: Atlas Energy
Installed Capacity: 2×600 MW
Location: Iskenderun
Scope: Planned Maintenance
Commencement Date: 2021 / 2022 / 2023
Date of Delivery: 2021 / 2022 / 2023