Atlas Energy 2×600 MW Thermal Power Plant Mechanical Maintenance Project

During the maintenance activities planned for the years 2021-2022 and 2022-2023, boiler tube replacements, pressure valve replacements, maintenance of the seawater intake pump, pulverized coal line replacements, maintenance and replacement of air dampers, APH (Air Preheater) maintenance, and various other tasks were completed.

Project and Details

Employer: Atlas Energy

Installed Capacity: 2×600 MW

Location: Iskenderun

Scope: Planned Maintenance

Commencement Date: 2021 / 2022 / 2023

Date of Delivery: 2021 / 2022 / 2023